|
Project Partners / Partner Cities / Amsterdam
|
|
Print this
|
|
|
| H2 infrastructure | Bus operation | Using renewable energy which together with water is the basis for hydrogen production on-site. A pressurised electrolyser produces high quality hydrogen and stored in on-site storage tank. The next step is to fill up the busses to 350 bar with a compressor connected to a high-pressure storage system at 420 bar. The filling time will be about 10 minutes. | The buses will be operated under the city-specific traffic control system. |
Local Project Partners
|