Project Partners / Partner Cities / Luxembourg
|
|
Print this
|
|
|
| H2 infrastructure | Bus operation | The design of the filling station and the technical characteristics of the compressor unit allow for a connection to an electrolyser. The trailer will be connected to the filling station. To fill the hydrogen into the busses, first of all a pressure compensation between the pressure in the trailers and that in the busses will be done. The second step is to fill up the busses to 350 bar with a compressor connected to a high-pressure storage system at 420 bar. The filling time will be about 10 minutes. | The buses will be operated under the city-specific traffic control system. | Local Project Partners Fuel Supply | |
Air Liquide, Luxembourg ° Air Liquide, France ° | |
| Bus operation | | | Fédération Luxembourgeoise des Exploitants d'Autobus et d'Autocars ASBL * | |
| * Project Partners ° Associated Partners |
| |
|
| | |