SEARCH: 
 
Search options
Home
 

Fuel Cell Bus Club

Ticker

Login
 
 

Project Partners / Partner Cities / Luxembourg Print this  
     
  • Centralised Hydrogen Production

  • Hydrogen Trucked In

Dissemination
Luxembourg City Portrait
City Policies

H2 infrastructureBus operation

The design of the filling station and the technical characteristics of the compressor unit allow for a connection to an electrolyser. The trailer will be connected to the filling station. To fill the hydrogen into the busses, first of all a pressure compensation between the pressure in the trailers and that in the busses will be done. The second step is to fill up the busses to 350 bar with a compressor connected to a high-pressure storage system at 420 bar. The filling time will be about 10 minutes.

The buses will be operated under the city-specific traffic control system.

Local Project Partners

Fuel Supply
 

Air Liquide, Luxembourg °

Air Liquide, France °

Bus operation
 
Fédération Luxembourgeoise des Exploitants d'Autobus et d'Autocars ASBL *
 
* Project Partners      ° Associated Partners


 


© 2000-2004 - All rights reserved.
Design by comunddesign
Content Management System (CMS) "PANTHEON" by itevo AG