Hydrogen production and refueling infrastructure
The design of the filling station and the technical characteristics of the compressor unit allow for a connection to an electrolyser. The trailer will be connected to the filling station. To fill the hydrogen into the busses, first of all a pressure compensation between the pressure in the trailers and that in the busses will be done. The second step is to fill up the busses to 350 bar with a compressor connected to a high-pressure storage system at 420 bar. The filling time will be about 10 minutes. |